Insulation Below vs Above a Concrete Raft Slab
How insulation position affects the wall-floor junction, floor build-up, thermal mass and construction sequence.
The two arrangements place the structural slab on different sides of the insulation layer. That changes the junction design and construction sequence, but the right specification still depends on the complete building and project details.
Quick Answer
Insulation below and around a concrete raft brings the slab within the insulated envelope and can simplify the wall-floor junction. Insulation above separates the structural slab from the internal space and normally needs a separate floor layer above it. The complete junction must be assessed for the proposed wall and floor build-up.
The Traditional Approach: Insulation Above
In a typical traditional raft, the structural concrete slab is poured directly onto the ground or a thin layer of blinding. Rigid insulation boards are then laid on top of the slab, followed by a screed layer and the final floor finish.
This approach has several drawbacks:
Thermal bridging at the perimeter. The concrete slab extends to the external walls, creating a direct thermal bridge. Even with edge insulation, the Psi-value at this junction is typically poor, increasing heat loss and complicating Passivhaus compliance.
Additional build-up height. Insulation above the slab adds 150–300mm to the floor build-up, which can create threshold issues, reduce headroom in basements, and complicate door and stair design.
Extra materials and trades. The screed layer adds cost, drying time, and an additional trade to coordinate. Any underfloor heating pipes must be embedded in the screed, adding further complexity.
The Insulated Raft Approach: Insulation Below
An insulated raft places the load-bearing concrete slab within a structural insulation layer. The insulation sits below and around the slab, creating a thermally protected envelope that extends down to ground level.
The advantages are significant:
A continuous insulation route at the perimeter. Wrapping insulation around the slab edge gives the designer a route to reduce additional heat flow at the wall-floor junction. The Psi-value still depends on the proposed wall build-up and should be calculated for the project.
Reduced build-up height. With no insulation or screed above the slab, the total floor build-up is thinner. This simplifies threshold details, preserves headroom, and reduces the need for steps or ramps at entrances.
Thermal mass on the inside. The concrete slab is exposed to the internal environment, allowing it to act as thermal mass. This helps regulate indoor temperatures, reducing overheating in summer and smoothing temperature swings in winter.
Fewer trades, faster build. With no screed required, the floor sequence is simplified. Underfloor heating can be laid directly on the slab surface, and finishes applied without waiting for screed to dry.
Side-by-Side Comparison
| Factor | Insulation Above (Traditional) | Insulation Below (Insulated Raft) |
|---|---|---|
| Slab edge thermal bridge | Significant — poor Psi-value | Designed to reduce junction heat loss; calculate for the wall build-up |
| Floor build-up height | Thicker (slab + insulation + screed) | Thinner (slab only, flush finish) |
| Thermal mass benefit | Separated from room by insulation | Exposed to room, regulates temperature |
| Screed required | Yes — adds cost and drying time | Not always; confirm the required finish and tolerances |
| Passivhaus suitability | Difficult — edge detailing complex | Can support a low-heat-loss junction; project modelling is still required |
| Underfloor heating | Embedded in screed | Coordinate the selected pipe position with the slab and floor finish |
What This Means for Your Project
For a low-energy or Passivhaus project, compare the calculated floor U-value and wall-floor Psi-value for the actual geometry and wall construction. Insulation position is one design decision within the complete energy model, not evidence of compliance by itself.
For other projects, compare the total floor build-up, thresholds, required finish, construction sequence and service coordination. Programme and cost effects depend on the proposed assembly and site plan, so they should be assessed project by project.
If underfloor heating is part of the proposal, the companion guide explains what the heating and foundation teams need to agree before the pour.
Certified Systems
Not all insulated rafts are equal. Look for systems that have been independently certified for thermal performance, structural safety, and fire resistance. ISOQUICK is a Passivhaus Certified Component with KIWA BDA Agrément, giving specifiers confidence that the system has been rigorously assessed.
When comparing systems, ask for certified U-values and Psi-values for your specific wall construction. The numbers should be available for timber frame, SIPs, ICF, masonry, and other common wall types.