Save Time, Labour and Resources on Site
For groundworkers, ISOQUICK® can reduce the labour and resources needed to install a house slab. For builders and developers, that means a shorter, simpler foundation programme and better control of installation costs.
Discuss Your Development →
Passivhaus Trust Patron
KIWA Assessed Construction System
KIWA BDA Agrément
Built for the Bottom Line
ISOQUICK® simplifies the foundation programme by combining insulated formwork and the structural ground-floor slab into one coordinated operation. With less excavation, fewer separate trades and a faster installation sequence, groundworkers can complete each house slab using less labour and fewer site resources.
Performance That Matters
Get out of the ground faster.
Install up to 400m2 of ISOQUICK® in a single day
Less Muck Away
A simple site strip with no trenches
Less concrete required
Predictable costs
Know how much soil has to come out, how much concrete is required to within ~1m3 before you put a spade in the ground
Minimal Site Waste
Factory-precut to your design, minimising on-site waste.
Case Studies
Real developments where ISOQUICK® delivered on programme, on budget, and above expectation.
Photo: Matthew Smith Architectural Photography
Three Passive Homes, St. Albans
3 plots, targeting Passivhaus certification. Strong market interest achieved on completion.
Photo: Ashley Groundworks
New-Build Farmhouse, Hampshire
A private client's replacement farmhouse, commissioned by Charlton Construction. Groundworks partner Ashley Groundworks installed the ISOQUICK raft foundation and drainage on schedule despite poor weather and restricted site access.
Competitive Advantages
Reduced Programme Time
Traditional foundations require shuttering, concrete pour, cure time, then separate floor insulation and screed. ISOQUICK combines shuttering, insulation, and structural slab in one operation. Your foundation and ground floor are complete in a single step.
Fewer Trade Dependencies
No need to coordinate separate groundworkers, insulators, and screed contractors. The ISOQUICK system arrives pre-cut and ready to install. Reduce scheduling conflicts and eliminate the domino effect of delayed trades.
What Developers Say
"Using an insulated raft foundation saves time and saves organising the extra trades that you need for a conventional foundation"
— Mike Whitfield, Mike Whitfield Construction Ltd"Just wanted to say a huge thank you for coming down to site yesterday to assist in the install of the ISOQuick system. It is a very impressive system indeed! I think everyone who saw it yesterday was blown away with how easy and quick it was to install with pretty much 0% waste."
— Tom Armstrong-Jones, Building Manager, Willmott Dixon Construction LimitedReady to Discuss Your Development?
A member of our team will call you within 24 hours. Whether it's 2 plots or 20, we'd like to hear about your project.