Scotland's approach to new-building energy performance is under review, with the Stage 2 consultation on its proposed Scottish equivalent to the Passivhaus standard closing on Friday 16 October 2026.
For architects, developers, engineers and contractors, the consultation raises questions that extend beyond individual product specifications. How should energy performance be measured? What should certification demonstrate? And how can the design and construction process provide greater confidence that buildings perform as intended?
The proposals are still being consulted on. They should not be treated as final requirements or described as making every new building a certified Passivhaus.
What is Scotland proposing?
The Scottish Government's Stage 2 consultation covers new homes and new non-domestic buildings.
It considers changes to energy performance targets, assessment methods and the processes used to demonstrate compliance. The proposals include a space-heating demand metric, changes to the way energy targets are set and further development of tools used to assess building performance.
The review also addresses ventilation, overheating and guidance for supporting design and construction statements.
These subjects are closely connected. A building's heating demand depends on its fabric, ventilation and overall design. Improving one element does not remove the need to coordinate the others.
The consultation therefore matters to the whole project team, from early feasibility through to installation and handover.
Why is the name “Passivhaus Equivalent” being questioned?
The Passivhaus Trust welcomes progress towards better-performing buildings, but questions whether the proposed standard should yet be described as equivalent to Passivhaus.
Its recommendation is to use “Passivhaus Informed” until equivalent performance has been demonstrated in practice.
That distinction matters because certified Passivhaus is assessed against an established set of performance and comfort criteria. A regulatory approach can draw on those principles while using different targets, calculation methods or assurance processes.
For a client choosing between project specifications, the name alone does not explain what will be delivered. Clear information about the performance target, assessment method and verification process is more useful.
The Trust's position is its response to the proposals, not a change to the Scottish Government's terminology.
A proposed route for certified Passivhaus
A significant part of the consultation is the proposed recognition of Passivhaus certification as an alternative means of compliance with Standard 6.1, “Energy demand”. The proposals also consider a modified version of the Passivhaus Planning Package, or PHPP, as an approved methodology.
The Passivhaus Trust supports this route for fully certified Passivhaus buildings. For project teams already pursuing certification, it could provide a clearer relationship between the Passivhaus process and the relevant Scottish building energy requirements.
It would not remove the need to comply with other applicable building standards. The proposal relates to the energy-demand compliance route, rather than blanket approval of the building. The final scope and supporting requirements will depend on the outcome of the review.
What is the proposed timetable?
The Scottish Government's published programme anticipates updated guidance and approved calculation methodologies becoming available in autumn 2027.
It also sets out a move from the previously scheduled 31 March 2028 implementation date to autumn 2029, allowing time for industry preparation.
The consultation considers approaches to implementation, including phasing and voluntary adoption ahead of mandatory compliance. Project teams should check the latest government position when planning future schemes. The consultation timetable does not mean that all final technical requirements have already been settled.
What does this mean for building fabric design?
Whatever the final regulatory approach, the practical challenge remains: the building needs a coordinated design that can be constructed and checked.
For teams working towards low energy demand, this includes attention to:
- Insulation continuity across the building envelope.
- Thermal bridging at junctions.
- Airtightness details and responsibility for their installation.
- Ventilation design and commissioning.
- Overheating assessment.
- Coordination between architectural, structural and building-services information.
These decisions interact. A wall specification needs to work with the floor, foundation, openings and roof. A well-developed detail also needs to account for the construction sequence and the people responsible for delivering it.
Resolving those interfaces during design gives the project team an opportunity to address problems before materials are ordered and work begins.
Where foundations enter the conversation
The wall-to-floor junction is one of the interfaces that deserves early attention.
The foundation approach must satisfy the site's ground conditions and structural requirements while allowing the intended insulation, moisture protection and airtightness details to be coordinated.
An insulated raft can be an option for suitable new-build projects. It is not an automatic requirement for Passivhaus, and the consultation does not establish it as a mandatory foundation type.
At ISOQUICK, we support teams considering our insulated raft foundation system by developing the system layout and thermal specification alongside the project team.
The qualified structural engineer remains responsible for the structural foundation design, loadings and reinforcement. Suitability needs to be assessed for the individual site and building.
Our technical details library can help teams explore how the foundation connects with their proposed wall construction, thresholds and services.
How to contribute before the deadline
The consultation closes on Friday 16 October 2026. The Scottish Government consultation portal explains how to respond.
The Passivhaus Trust has published guidance explaining its position and helping individuals and organisations prepare their responses.
Practical experience is valuable here. Designers can contribute lessons from assessment and detailing. Contractors can identify installation and verification challenges. Developers can explain how the proposals affect project planning and delivery.
Read the Scottish Government's consultation and the Passivhaus Trust's response before submitting your views. Background and working-group records are available on the Scottish Passivhaus Equivalent Working Group page.