Residential
New-Build Farmhouse, Hampshire
Replacement farmhouse delivered in challenging site conditions
Project overview
Commissioned by Charlton Construction, with the ISOQUICK raft foundation and drainage installed by Ashley Groundworks on schedule despite poor weather and restricted site access.
Installation gallery
Discuss your project
Tell us the project location, building type or proposed wall system, current stage and whether drawings are available. Drawings are helpful, but they are not required for the first conversation.
Discuss your project