Gorslas School
School project with insulated raft foundation works
Project overview
One of three new primary schools built for Carmarthenshire County Council, alongside Kidwelly School and Ysgol Y Castell.
The ISOQUICK base covered approximately 1,200m² and was installed over three days by a team of three.
The simple shape and efficient form factor meant that only 150mm of ISOQUICK was required, providing the shutter for a flat 250mm concrete slab.
What ISOQUICK contributed
The ISOQUICK base covered approximately 1,200 m² and was installed over three days by a team of three. The project record states that 150 mm of ISOQUICK provided the shutter for a flat 250 mm concrete slab.
Installation gallery
Installation guidance
Review the existing groundworks and ISOQUICK installation guides. These are general documents and do not describe this project's specification.
Groundworks guide (PDF)ISOQUICK installation guide (PDF)
Related technical guidance
Explore general drawings and guidance for coordinating an insulated raft foundation. Project-specific design must be confirmed separately.
Browse technical detailsFive junctions to resolve before construction
Discuss your project
Tell us the project location, building type or proposed wall system, current stage and whether drawings are available. Drawings are helpful, but they are not required for the first conversation.
Discuss your project