Gorslas School

School project with insulated raft foundation works

Project Type
School / Education
Location
Gorslas
Client
Lloyd and Gravell

Project overview

One of three new primary schools built for Carmarthenshire County Council, alongside Kidwelly School and Ysgol Y Castell.

The ISOQUICK base covered approximately 1,200m² and was installed over three days by a team of three.

The simple shape and efficient form factor meant that only 150mm of ISOQUICK was required, providing the shutter for a flat 250mm concrete slab.

Visit the Ysgol Gorslas website.

What ISOQUICK contributed

The ISOQUICK base covered approximately 1,200 m² and was installed over three days by a team of three. The project record states that 150 mm of ISOQUICK provided the shutter for a flat 250 mm concrete slab.

Installation gallery

Early installation of the ISOQUICK edge modules.
Early installation of the ISOQUICK edge modules.
The insulated foundation system extending across the school footprint.
The insulated foundation system extending across the school footprint.
Edge modules and insulation during installation.
Edge modules and insulation during installation.
A wide view of the prepared ISOQUICK foundation.
A wide view of the prepared ISOQUICK foundation.
The foundation installation viewed across the site.
The foundation installation viewed across the site.
Completed preparation before the next construction stage.
Completed preparation before the next construction stage.

Installation guidance

Review the existing groundworks and ISOQUICK installation guides. These are general documents and do not describe this project's specification.

Groundworks guide (PDF)
ISOQUICK installation guide (PDF)

Related technical guidance

Explore general drawings and guidance for coordinating an insulated raft foundation. Project-specific design must be confirmed separately.

Browse technical details
Five junctions to resolve before construction

Discuss your project

Tell us the project location, building type or proposed wall system, current stage and whether drawings are available. Drawings are helpful, but they are not required for the first conversation.

Discuss your project