Willmott Dixon Collida Living
Show home targeting Passivhaus Plus and net zero carbon in operation
Project overview
Willmott Dixon selected ISOQUICK for the foundation of its Collida Living show home. Project information displayed on site identifies the scheme as targeting Passivhaus Plus and net zero carbon in operation, with 70% modern methods of construction components.
What ISOQUICK contributed
ISOQUICK supplied the insulated raft foundation system. The photographs document the assembled foundation system and later site progress.
Installation gallery
Installation guidance
Review the existing groundworks and ISOQUICK installation guides. These are general documents and do not describe this project's specification.
Groundworks guide (PDF)ISOQUICK installation guide (PDF)
Related technical guidance
Explore general drawings and guidance for coordinating an insulated raft foundation. Project-specific design must be confirmed separately.
Browse technical detailsFive junctions to resolve before construction
Discuss your project
Tell us the project location, building type or proposed wall system, current stage and whether drawings are available. Drawings are helpful, but they are not required for the first conversation.
Discuss your project