Knowledge Centre
Blogs, FAQs, technical downloads and guided journeys — everything you need to understand insulated raft foundations.
Who is this for?
Choose your path and we'll walk you through the essentials for your role.
Self-Builders
First principles, costs, and getting started on your self-build project.
Start journey →Architects
Thermal data, CAD details, specifications, and RIBA stage guidance.
Start journey →Timber Frame Companies
Precision tolerances, thermal performance, and trade partnership.
Start journey →Builders & Developers
Programme savings, compliance, and cost comparisons at scale.
Start journey →Browse all content
What Do You Need for an Insulated Raft Foundation Quote?
The drawings, ground information, wall details and performance targets that help ISOQUICK assess a project quotation.
Building with Timber Frame or SIPs? What to Agree Before the Foundation Is Built
Seven points for the architect, engineer, wall supplier, foundation supplier and contractor to resolve before the foundation is built and the wall package is manufactured.
How to Reduce Thermal Bridging at a Floor Slab Junction
How coordinated wall, slab-edge and structural design can reduce additional heat flow at a foundation junction.
Underfloor Heating in an Insulated Raft Foundation: What to Agree Before the Pour
A practical checklist for coordinating heating pipework, manifolds, services and floor levels with an insulated raft.
How Long Does an Insulated Raft Foundation Take to Install?
ISOQUICK assembly can take as little as two hours. Learn what affects the installation timeline and how to plan your programme.
Insulated Raft Foundation Installation: The Construction Sequence Explained
The sequence from ground preparation and services through insulation, membranes, reinforcement and concrete.
Insulated Raft Foundation Details: 5 Junctions to Resolve Before Construction
Five wall, threshold and service interfaces architects should coordinate before the raft is detailed and poured.
What is an insulated raft foundation?
An insulated raft foundation is a reinforced concrete slab that sits on top of a layer of load-bearing insulation, with more insulation wrapped around its...
What Determines Concrete Slab Thickness in an Insulated Raft Foundation?
There is no universal statutory concrete slab thickness for every insulated raft foundation. ISOQUICK recommends a minimum 200mm concrete slab for domestic...
Technical Details (PDF Library)
Typical Section
All
Standard Edge Detailing
All
Edge & Base Combinations
All
Edge Details — Common Variations
All
Brick Plinth Detail
Brick & Block
SD-0022 — Brick Support, DPM Under Slab
Brick & Block
SD-0022A — Brick Support, DPM Above Slab
Brick & Block
SD-0022B — Brick Support, Waterproof Concrete
Brick & Block
Solid Aircrete Wall with EWI
Brick & Block
Hollow Clay Blocks Detail
Brick & Block
Timber Frame & SIPs Wall Junction
Timber Frame, SIPs
Larsen Truss Detail
Timber Frame
I-Stud Twin Wall — Dual Bearing
I-Stud
Twin Wall I-Stud — Inner Bearing
I-Stud
Sole Plate Location Guidance
Timber Frame
ICF Wall Detail
ICF
Wood-Cement Fibre Blocks Detail
Brick & Block
Slate & Tile Edge Detail
All
Party Walls Detail
All
SD-0023 — Threshold Detail
All
SD-0031 — EM10 Threshold Support
All
SD-0032 — EM15 Threshold Support
All
SD-0033 — EM20 Threshold Support
All
ISOQUICK Threshold Support Brochure
All
SD-0018 — Drains and Ducts
All
SD-0015 — External Tanking
All
SD-0003 — General Sub-Base Arrangements
All
Stepped Footing — Large
All
Stepped Footing — Small
All
DPC & Full Radon Protection
All
Underfloor Heating Options Guide
All
Installation Guide — Part 1: Groundworks
All
Installation Guide — Part 2: ISOQUICK Installation
All
Installation Guide — Part 3: Brick Support System
Brick & Block
ISOQUICK Brick Support System — Introduction
Brick & Block
ISOQUICK Brick Support System — How It Works
Brick & Block
IQ Technical Specification
All
IQ-60e U-Value Tables
All
IQ-90 U-Value Tables
All
IQ-210 U-Value Tables
All
Kiwa BDA 3rd Party Certification
All